EXISTING TRANSIT ROUTES & THE PROPOSED TRANSITWAY (in blue)

This map from the 2018 Transitway Feasibility Study shows the right-of-way in blue and existing RTA routes in different colors. A connection to the DowntownTransit Center will link to the future Bus Rapid Transit (BRT) line connecting to Washington and points beyond via Route 29. A future phase, routing the Transitway across a new transit-only bridge across US29 will provide the transit backbone which was the key piece of Rouse's original plan and provide a more efficient link between Downtown and Gateway. 

© 2016 by Friends of Bridge Columbia